Proven Performance
Across 300+ Projects
From Southeast Asia to Europe, we help steel manufacturers double their capacity and cut energy costs.
Capacity Doubled
Expansion goals met ahead of schedule.
Doubling Capacity for a
Leading Stainless Steel Producer
The Challenge
The client needed to process 201 material but their existing equipment suffered from frequent strip breaks and low yield. They needed a solution fast to catch the market upturn.
The JINYE Solution
We delivered a custom 20-High Sendzimir Mill in just 300 days. The mill was specifically engineered with high-rigidity housing to handle the hardness of 201 stainless steel.
Achieving 0.03mm Foil
Production Standard
The Challenge
A European precision alloy manufacturer required a mill capable of rolling ultra-thin foils for electronic applications. The tolerance requirement was a strict ±0.005mm.
The JINYE Solution
We provided a high-precision 20-High Mill with advanced AGC systems. We also implemented our "Silent Factory" technology, keeping noise levels below 60db to meet strict EU labor regulations.
Greenfield Silicon
Steel Plant Project
The Challenge
The client was building a new factory from scratch (Greenfield) and needed a full "Turnkey" solution—from layout design to final commissioning—with a strict focus on energy efficiency.
The JINYE Solution
We managed the entire lifecycle. Our solution included a 20-High Mill integrated with a High-Speed Bright Annealing Line, featuring our latest oil mist recovery tech.
Want to See
Detailed Reports?
Download our in-depth case study PDF to see the technical data, yield analysis, and engineering specifications behind the success.
File Size
4.5 MB